Project name | Constructione Museum of ancient history in Ust-Labinsk |
Industry classification | Finance and real estate |
Basic information about the project |
---|
Project essence | Complex historical and ethnographic museum |
Project capacity | 50-75 thousand visitors in a year (including the visitors of movable exhibitions) |
Consumer market description | Habitants Ust-Labinsk and nearby districts, tourists from ÞÔÎ (transit, business tourists, students historical and other Institutions of higher learning, research workers) |
Object construction term | 3.00 |
Competitive advantage | Creation of object of the sociocultural setting, capable to become (in composition a display complex) the factor of identity of Ust-Labinsk and gravitating to him territory in consciousness of both habitants of city and his guests |
Resource availability for project realization | Conceptual connection of museum with Aleksandrovskoy by a fortress, by an ethnographic area the «Kuban cossack village» and by expeditions, workings on the archaeological monument of «Fanagoriya» |
Planned volume of resource consumption (annual) |
---|
Planned volume of electricity consumption (annual), MWh | 0.20 |
Planned volume of gas consumption (annual), million cubic meters | 0.06 |
Planned volume of water consumption (annual), million cubic meters | 0.03 |
Financial estimation of the project |
---|
Total cost of the project, mln rubles | 237.54 |
Own resources, million rubles | 237.54 |
Means of regional (municipal) budget, million rubles | |
Previously involved means, million rubles | |
Investment capacity, mln rubles | |
Conditions of investor participation | Direct investments |
Form of investments return | Monetary |
Payback period | |
Basic indicators of investment project economic efficiency |
---|
Net present value (NPV) | 8.20 |
Simple payback time | 25.50 |
Discounted payback period | 28.80 |
Internal rate of return (IRR) | 0.14 |
Productivity index (PI) | 0.04 |
Income per year | 9.30 |
Social efficiency of investment project |
---|
Number of workplaces | 21 |
Salary average level (thousand rub per year) | 240.00 |
Budgetary efficiency of investment project |
---|
Mid-annual tax payments, million rubles | 2.33 |
which includes into consolidated budget of the krai, million rubles | 1.60 |
General information about the ground area |
---|
Address of the area | Russia, Krasnodar region, Ust-Labinsk, Sovetskaya Str, 52 |
Cadastre account of ground area | Registered |
Cadastre number of area/of quarter | 23:35:0531009:8 |
Declared area (m2) | 1753.00 |
Limit size of the area (m2) | 1753.00 |
Land category | Lands of inhabited localities |
Kind of allowed use | Business building |
Actual use | Not used |
Availability of buildings, structures, constructions | No |
Permits, town-planning documentation | Town-planning conclusion of the department of architecture and urban planning of the municipal administration of Ust-Labinsk District on July 8, 2016 number 2-16 |
Information about proprietor (right holder) |
---|
Proprietor | Russian Federation |
Right holder | Municipal Education Ust Labinskiy district |
Kind of right | Constant (termless) using |
Information about encumbrance and limitation |
---|
Kind of encumbrance, limitation | not registered |
Encumbrance area | |
Electricity supply |
---|
Power supply center (name, right-holder) | Filial JSC "NESK-electricity" Ust-Labinskelektroset " |
Power supply center (electrotension class) | Middle class of tension – from 1 kV to 35 kV |
Power supply center (free power (MWt)) | 0.50 |
Power supply center (distance(m)) | 250.00 |
Nearest connection point (network tension, kV) | 10.00 |
Nearest connection point (distance(m)) | 250.00 |
Gas-supplying |
---|
Gas pipeline (name, right-holder) | JSC Ust-Labinskraygaz |
Gas pipeline (diameter(mm)) | 120.00 |
Gas pipeline (pressure(MPa)) | Low-pressure pipelines – to 0,005 |
Gas pipeline (carrying capacity(cube. m.in a year)) | 163812.00 |
Gas pipeline (distance(m)) | 100.00 |
Nearest connection point (diameter(mm)) | 300.00 |
Nearest connection point (pressure (MPa)) | High pressure pipelines of the II category – from 0,3 to 0,6 |
Nearest connection point (carrying capacity (cubic meter a year)) | 163812.00 |
Nearest connection point (distance(m)) | 100.00 |
Water-supply |
---|
Water supply source (name, right-holder) | JSC "Plumbing" |
Water supply source (power (cubic meters a day)) | 660.00 |
Water supply source (quality of water) | Drinking water |
Water supply source (distance(m)) | 20.00 |
Nearest connection point (power (cubic meters a day)) | 660.00 |
Nearest connection point (diameter(mm)) | 200.00 |
Nearest connection point (distance(m)) | 60.00 |
Sewage system |
---|
Type of building (name, right-holder) | LLC "sewage treatment plants" |
Type of building (power (cubic meters a day)) | 500.00 |
Type of building (distance(m)) | 60.00 |
Nearest point of connection (power (cubic meters a day)) | 500.00 |
Nearest point of connection (diameter(mm)) | 400.00 |
Nearest point of connection (distance(m)) | 80.00 |
Installation of telephones/internet |
---|
Central network (distance(m)) | 10.00 |
Mobile communication (distance(m)) | 10.00 |
Rated price of the ground area supplying with engineering, mln.rub | 3.50 |
Distance to the large settlements and objects of a transport infrastructure |
---|
Remoteness from | Name | Distance (km) |
---|
center of municipal formation | t. Ust-Labinsk | |
nearest settlement | t.Ust-Labinsk | |
Center of federal subject | Krasnodar city | 56.00 |
highways (regional, federal value) | Temryuk – Krasnodar – Kropotkin | 5.70 |
highways of local value | Sovetskaya Str. | |
nearest railway station | Ust-Labinskaya | 2.10 |
nearest railway | t. Ust-Labinsk | 2.10 |
airport | Krasnodar airport | 59.80 |
seaport | seaport Novorossiysk | 220.00 |
Additional information about the ground area |
---|
Special conditions | Relief area relatively quiet, ground water below 6 meters, soil subsidence, seismicity of the area 8 points, the direction of the prevailing winds east. Lot land is in the border of guard zone of monuments of archaeology. |
Cost of rent/buy of the ground area, mln. rub | |
Geographical coordinates of object (dd.dddddd) |
---|
Latitude (N) | 45.20565578 |
Longitude (E) | 39.68688512 |
Data on the project initiator (in case of existence information about the legal/physical person) |
---|
Name / Full name | Limit liability company "Campos", Emelianenko Alexander Vladimirovich, director general |
Postal address | 352330, Russia, Krasnodar region, Ust-Labinsk, Mira str., 77 |
Phone/fax | 8(86135)5-10-65, 4-13-99 |
E-mail address | f_southrussia@mail.ru |
Data about the applicant (executive authority/local government executive authority) |
---|
Name | Ust-Labinsk District Municipal Formation Authority Post address: 352330, t. Ust-labinsk, Krasnodar region, ul. Lenina, 38 Website: www.ust-labinsk.com Telephone/fax: 8 (86135) 4-12-03 Email: adminustlab@rambler.ru The responsible executor (name, post, phone):Viuyrkova LN Head of Economy Department, Ust-Labinsk District Municipal Formation Authority Phone: 8 (68135)4-12-01 |
Postal address | 352330, Russia, Krasnodar region, Ust-Labinsk, Lenina, 38 |
Site | adminustlabinsk.ru |
Phone/fax | 8(86135)5 28 68 |
E-mail address | ust_labinsk@mo.krasnodar.ru; ustlab.ekonom@yandex.ru |
Executive (Full name, work position, phone number) | Stepanova E.N. - leading specialist of management of economy, administration of municipality Ust-Labinsky district, (86135) 5-28-68 |